Contract administration packs

A ready-to-use contract administration pack for contractors and subcontractors, built from your contract: draft notices, an obligations and time-bar register, an administration guide, flow-down requirements and claim workflows.

When to call
At start-up, before the first notice falls due.
What you receive
Draft notices, an obligations and time-bar register, an administration guide, flow-down requirements and claim workflows, built from your contract.

Where this service sits in a project

  1. Tender
  2. Award
  3. Delivery
  4. Completion
  5. Final account
  6. Dispute

Fig. 1Contract administration packs against the life of a project, with the other services behind it.

Source: SUMIT services, as at October 2026. Indicative: every project differs.

What the work covers

  1. 01notice and correspondence packs
  2. 02obligations and rights registers
  3. 03contract administration guides
  4. 04subcontract flow-down schedules
  5. 05claim and notice workflows
  6. 06deadline calendars

How it runs

  1. Step 01

    Intake call

    Your executed contract, your letterhead and the issues that matter most to your team.

    • Contract · Executed
  2. Step 02

    Register build

    Every obligation, right, time bar and condition precedent, with its clause, trigger and timeframe.

    • Register · Obligations and time bars
    • cl 34.3 · 28-day claim · Extension of time
  3. Step 03

    Verification

    Each entry checked again against the contract text, and every time bar reviewed by a Chartered Quantity Surveyor.

    • Checked · Chartered Quantity Surveyor
  4. Step 04

    Notices, workflows and guide

    A draft letter for every notice on your letterhead, claim workflows, the deadline calendar, the administration guide and the flow-down schedule.

    • EOT 01 · cl 34.3 · Draft letter, your letterhead
  5. Step 05

    Handover

    A one-hour walkthrough with your team, then a window for questions.

    • Walkthrough · With your team

Illustrative. The tags show what each step produces; clause references are to AS 4000-1997.

Timing depends on the matter. Contact SUMIT to discuss yours.

Selected work

  1. 01

    Drafted a start-up notice pack of 27 templates and 21 letters for a Tier 2 builder's head contract on a major regional shopping centre redevelopment, from a 1,175-item obligations register.

    Major regional shopping centre redevelopment, Sydney

  2. 02

    Prepared a 630-item rights and obligations register and correspondence templates for a rail systems network supply deed.

    Rail systems nominated subcontract, South East Queensland

  3. 03

    Drafted notice templates for all of a specialist engineering contractor's major contracts, and its contract administration guideline.

    Defence, rail and water contract portfolio

Fees and engagement

Table 1How this work is usually charged.
BasisUsed for
Fixed feeA defined scope: a claim, a payment schedule, a contract review or a contract administration pack

Other engagement models are on the Advisory page.

Speak to a director

Facing a notice, a claim or a payment deadline? Call Malachy on 0452 549 257.

Discuss your project

Written by Malachy Mullin, Director. Last reviewed 13 October 2026.